Wahyudi, E., & Girsang, H. (2025). Analisis Metode Percepatan Pekerjaan Pondasi Borepile Berbasis Time Cost Trade off Proyek Tower Merial Jakarta . Jurnal Tekno Global, 14(01), 37–46. https://doi.org/10.36982/jtg.v14i01.5342