Wahyudi, E. and Girsang, H. (2025) “Analisis Metode Percepatan Pekerjaan Pondasi Borepile Berbasis Time Cost Trade off Proyek Tower Merial Jakarta ”, Jurnal Tekno Global, 14(01), pp. 37–46. doi: 10.36982/jtg.v14i01.5342.