Wahyudi, E., and H. Girsang. “Analisis Metode Percepatan Pekerjaan Pondasi Borepile Berbasis Time Cost Trade off Proyek Tower Merial Jakarta”. Jurnal Tekno Global, vol. 14, no. 01, Aug. 2025, pp. 37-46, doi:10.36982/jtg.v14i01.5342.